The
most important part of ensuring the quality and long life of your new epoxy
flooring system begins here on Day 1. Photo 1 shows the scarification
process with a modern vacuum shot blast machine. This process removes
a thin layer of concrete, along with stains, dirt and oils, and allows for a
superior mechanical bond with the epoxy - a bond which cannot be achieved
with harmful chemicals and water-based cleaners. Photo 2 - Grinding
rough edges and small protrusions. Photo 3 - Vacuuming
floor to remove any dust and debris left from scarification and
grinding. Photo 4 - Patching cracks, and divots in original
concrete floor. Photo 5 - Rolling on epoxy primer which seals and
mechanically bonds to concrete. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
On
Day 2, the primer has mechanically bonded to the concrete. Before applying
the top coat in your chosen color, the primer is lightly sanded either
mechanically or by hand which removes any unwanted foreign debris trapped in
the drying process and smoothes the surface - Photo 1. Photo 2
shows the top coat being rolled on. If you requested additional floor
treatments, such as color
chips, these will be applied at this time and your floor will be
finished on Day 3. |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Depending
upon your custom options and floor treatments, on Day 3, the floor will be
lightly sanded again to smooth the color chips, and to give the floor a
smoother appearance. After sanding and vacuuming, a clear coat is
applied (Photo 1) along with final cleaning and detailing. Photo
2 shows the completed project which after 24 hours will be cured
sufficiently for foot traffic. In
72 hours your new floor is completely cured and ready for your vehicles and household
items - Photo 3. |
 |
 |
|